S.No. |
Project Title |
Contract Value (BD) |
Client |
Commencement & Completion Date |
1 |
Infrastructure Works, 230no. Town Houses, Block 643/646, Nuwaidrat |
1,036,460.000 |
Ministry of Housing |
Completed 2008 |
2 |
Earthwork, Kerbing, Paving and storm Water Channel Work, Lawzi Lake Hamad Town Contract -3 |
749,000.000 |
Ministry of Housing |
Completed 2010 |
3 |
Infrastructure Works, Phase 1, Contract ‘1’, Block 1020 & 1026, Lawzi Lake, Hamad Town |
1,512,153.000 |
Ministry of Housing |
Completed 2008 |
4 |
Alba Plant Security Project – Main Fence |
1,915,959.000 |
Aluminium Bahrain |
11th May 2010 to 10th May 2012 |
5 |
Site 154, Block 1212, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works |
789,537.000 |
Ministry of Housing |
01st Dec 2009 to 30th Nov 2010 |
6 |
Site 155, Block 1214, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works |
399,949.000 |
Ministry of Housing |
01st Dec 2009 to 31st Aug 2010 |
7 |
Civil works term Contract |
400,000.000 |
Ministry of Works |
2009- 2011 |
8 |
Refurbishment of Line 4 and 5 Pot Shell |
795,598.000 |
Aluminium Bahrain |
January 2009 to January 2011 |
9 |
Refurbishment of Anode Rods |
90,343.000 |
Aluminium Bahrain |
May 2009 to April 2011 |
10 |
Cathode Sealing |
429,132.000 |
Aluminium Bahrain |
September 2008 to August 2010 |
11 |
Improvement of Buquwah Village Roads (Block 447, 445, 457) |
1,221,000.000 |
Ministry of Works |
October 2010 to September 2011 |
12 |
Infrastructure works for 77 Nos Townhouses and 12 Nos Apartment buildings, at Site 133, Block 1026 & 1028 Luwzi lake (Phase 3) |
976,348.000 |
Ministry of Housing |
December 2010 to June 2011 |
13 |
Diesel Tank And Filling Facilities At Calciner |
41,641.000 |
Aluminium Bahrain |
September 2010 to March 2011 |
14 |
Refurbishment of Line 4 and 5 Pot Shell |
647,365.000 |
Aluminium Bahrain |
June 2011 to June 2014 |
15 |
Fabrication of Drain Sows |
42,000.000 |
Aluminium Bahrain |
May 2011 to October 2011 |
16 |
Cathode Sealing, Ramming & Shell repair |
215,324.250 |
Aluminium Bahrain |
June 2011 to December 2011 |
17 |
Casthouse Annual Shutdown |
30,400.000 |
Aluminium Bahrain |
September 2011 to September 2012 |
18 |
Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB |
365,775.000 |
Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) |
Completed |
19 |
Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB 08 |
965,000.000 |
Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) |
Completed |
20 |
Earth works for well manifold, Bapco |
685,200.000 |
Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) |
Completed |
21 |
Civil Term Works Contract |
526,315.790 |
Ministry of Works |
2011 to 2013 |
22 |
Infrastructure Works at Site 153, Hamad Town |
748,520.000 |
Ministry of Housing |
Completed |
23 |
EPC Pipeline Project |
248,387.451 |
Tatweer Petroleum / MC: Ramsis Engineering |
Completed |
24 |
Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 1 |
994,428.500 |
Ministry of Works / MC: Bluewater Bio |
Completed |
25 |
Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 2 |
1,075,053.000 |
Ministry of Works / MC: Bluewater Bio |
Completed |
26 |
Term Contract Earthworks |
2,909,949.750 |
Ministry of Housing |
On-going |
27 |
New Waste Management Sump Facility |
383,438.645 |
Bahrain STS |
Completed |
28 |
HDPE Ring Main |
1,988,262.636 |
Bahrain STS |
Completed |
29 |
Improvement of Shaikh Daij Palace Junction |
771,426.593 |
Ministry of Works |
Completed |
30 |
Infrastructure works for 315nos T3M Houses at Site 128, Sanad |
970,321.720 |
Ministry of Housing |
On-going |
31 |
Infrastructure works for 117nos T8 Houses, Site 159 Block 950, Askar |
628,998.000 |
Ministry of Housing |
Completed |
32 |
Construction of 470m length of Retaining wall at Hunainiya Housing Project |
282,000.000 |
Ministry of Housing |
Completed |
33 |
Site Preparation and General Earthworks at Sanad |
156,872.000 |
Ministry of Housing |
Completed |
34 |
Site Preparation and General Earthworks at Salmabad |
1,556,450.000 |
Ministry of Housing |
On-going |
35 |
Refurbishment of Cast House 1 Cooling Compound |
92,148.000 |
ALBA |
Completed |
36 |
Extension of Bath Storage area at Rodding 1 |
212,500.000 |
ALBA |
Completed |
37 |
Line 1 – 3 Pot Shell repairing |
876,680.000 |
ALBA |
On-going |
38 |
Replacement of Underground Potable Waterline |
141,512.000 |
ALBA |
Completed |
39 |
Installation of Cast Iron cleaning system |
211,200.000 |
ALBA |
On-going |
40 |
Line 4 – 5 Pot Shell repairing |
271,950.000 |
ALBA |
On-going |
41 |
Bus bar and Flexible modification |
1,097,164.000 |
ALBA |
On-going |
42 |
Repair works for GTC 3 & 4 Compartments |
127,000.000 |
ALBA |
On-going |
43 |
Anode Repair works |
298,875.000 |
ALBA |
On-going |
44 |
Infrastructure for Banan Sadad Housing Project |
320,000.000 |
Al Namal |
On-going |