S.No. | Project Title | Contract Value (BD) | Client | Commencement & Completion Date |
1 | Infrastructure Works, 230no. Town Houses, Block 643/646, Nuwaidrat | 1,036,460.000 | Ministry of Housing | Completed 2008 |
2 | Earthwork, Kerbing, Paving and storm Water Channel Work, Lawzi Lake Hamad Town Contract -3 | 749,000.000 | Ministry of Housing | Completed 2010 |
3 | Infrastructure Works, Phase 1, Contract ‘1’, Block 1020 & 1026, Lawzi Lake, Hamad Town | 1,512,153.000 | Ministry of Housing | Completed 2008 |
4 | Alba Plant Security Project – Main Fence | 1,915,959.000 | Aluminium Bahrain | 11th May 2010 to 10th May 2012 |
5 | Site 154, Block 1212, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works | 789,537.000 | Ministry of Housing | 01st Dec 2009 to 30th Nov 2010 |
6 | Site 155, Block 1214, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works | 399,949.000 | Ministry of Housing | 01st Dec 2009 to 31st Aug 2010 |
7 | Civil works term Contract | 400,000.000 | Ministry of Works | 2009- 2011 |
8 | Refurbishment of Line 4 and 5 Pot Shell | 795,598.000 | Aluminium Bahrain | January 2009 to January 2011 |
9 | Refurbishment of Anode Rods | 90,343.000 | Aluminium Bahrain | May 2009 to April 2011 |
10 | Cathode Sealing | 429,132.000 | Aluminium Bahrain | September 2008 to August 2010 |
11 | Improvement of Buquwah Village Roads (Block 447, 445, 457) | 1,221,000.000 | Ministry of Works | October 2010 to September 2011 |
12 | Infrastructure works for 77 Nos Townhouses and 12 Nos Apartment buildings, at Site 133, Block 1026 & 1028 Luwzi lake (Phase 3) | 976,348.000 | Ministry of Housing | December 2010 to June 2011 |
13 | Diesel Tank And Filling Facilities At Calciner | 41,641.000 | Aluminium Bahrain | September 2010 to March 2011 |
14 | Refurbishment of Line 4 and 5 Pot Shell | 647,365.000 | Aluminium Bahrain | June 2011 to June 2014 |
15 | Fabrication of Drain Sows | 42,000.000 | Aluminium Bahrain | May 2011 to October 2011 |
16 | Cathode Sealing, Ramming & Shell repair | 215,324.250 | Aluminium Bahrain | June 2011 to December 2011 |
17 | Casthouse Annual Shutdown | 30,400.000 | Aluminium Bahrain | September 2011 to September 2012 |
18 | Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB | 365,775.000 | Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) | Completed |
19 | Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB 08 | 965,000.000 | Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) | Completed |
20 | Earth works for well manifold, Bapco | 685,200.000 | Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) | Completed |
21 | Civil Term Works Contract | 526,315.790 | Ministry of Works | 2011 to 2013 |
22 | Infrastructure Works at Site 153, Hamad Town | 748,520.000 | Ministry of Housing | Completed |
23 | EPC Pipeline Project | 248,387.451 | Tatweer Petroleum / MC: Ramsis Engineering | Completed |
24 | Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 1 | 994,428.500 | Ministry of Works / MC: Bluewater Bio | Completed |
25 | Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 2 | 1,075,053.000 | Ministry of Works / MC: Bluewater Bio | Completed |
26 | Term Contract Earthworks | 2,909,949.750 | Ministry of Housing | On-going |
27 | New Waste Management Sump Facility | 383,438.645 | Bahrain STS | Completed |
28 | HDPE Ring Main | 1,988,262.636 | Bahrain STS | Completed |
29 | Improvement of Shaikh Daij Palace Junction | 771,426.593 | Ministry of Works | Completed |
30 | Infrastructure works for 315nos T3M Houses at Site 128, Sanad | 970,321.720 | Ministry of Housing | On-going |
31 | Infrastructure works for 117nos T8 Houses, Site 159 Block 950, Askar | 628,998.000 | Ministry of Housing | Completed |
32 | Construction of 470m length of Retaining wall at Hunainiya Housing Project | 282,000.000 | Ministry of Housing | Completed |
33 | Site Preparation and General Earthworks at Sanad | 156,872.000 | Ministry of Housing | Completed |
34 | Site Preparation and General Earthworks at Salmabad | 1,556,450.000 | Ministry of Housing | On-going |
35 | Refurbishment of Cast House 1 Cooling Compound | 92,148.000 | ALBA | Completed |
36 | Extension of Bath Storage area at Rodding 1 | 212,500.000 | ALBA | Completed |
37 | Line 1 – 3 Pot Shell repairing | 876,680.000 | ALBA | On-going |
38 | Replacement of Underground Potable Waterline | 141,512.000 | ALBA | Completed |
39 | Installation of Cast Iron cleaning system | 211,200.000 | ALBA | On-going |
40 | Line 4 – 5 Pot Shell repairing | 271,950.000 | ALBA | On-going |
41 | Bus bar and Flexible modification | 1,097,164.000 | ALBA | On-going |
42 | Repair works for GTC 3 & 4 Compartments | 127,000.000 | ALBA | On-going |
43 | Anode Repair works | 298,875.000 | ALBA | On-going |
44 | Infrastructure for Banan Sadad Housing Project | 320,000.000 | Al Namal | On-going |
S.No. | Ref No. | Project Title | Contract Value | Client | Year Engaged |
1 | FWI Contract 1-BD-0275A | Refinery Gas Desulphurisation Project | BAPCO/ Foster Wheeler | 2007 | |
2 | Contract No. C0182 | Upgrade Oily Water Separator-Sitra Tank Farm | BAPCO | 2000 | |
3 | Tender No.- T117 | Provide and Install Fence and Property Markers at Valve Stations | BANOCO | 2000 | |
4 | Contract No. 1883 | New Fencing Around Khuff Well# 580 & Drlg Sump Demolition: Moan Items | BANOCO | 2000 | |
5 | Well 360 & 367: Removal/Reinstallation of Fencing | BANOCO | 2000 | ||
6 | Contract No. 1836 | New Fencing Around Khuff Well# 579 & Drlg Sump Demolition: Moan Items | BANOCO | 2000 | |
7 | Contract No. 1878 | New Fencing Around Khuff Well# 578 & Drlg Sump Demolition: Moan Items | BANOCO | 2000 | |
8 | Contract No. 1885 | Civil Works for New Gas Dehydration Unit K-28 | BANOCO | 1999 | |
9 | Contract No.1557 | Construction of New Warehouse at Jebel | BANOCO | 1999 | |
10 | Contract No. 1811 | Mechanical Works at HMS & HPWC | BANOCO | 1999 | |
11 | Contract No. 1649 | Site Preparation & Cellar Construction for Wells 587,591,593,595 & 607 | BANOCO | 1998 | |
12 | Contract No. 1729 | Construction Services of the Onshore 16" dia Pipeline between GPIC & Al Dar Valve Stations | BANOCO | 1998 |
S.No. | Project Title | Contract Value (BD) | Client | Commencement & Completion Date |
1 | Infrastructure Works, 230no. Town Houses, Block 643/646, Nuwaidrat | 1,036,460.000 | Ministry of Housing | Completed 2008 |
2 | Earthwork, Kerbing, Paving and storm Water Channel Work, Lawzi Lake Hamad Town Contract -3 | 749,000.000 | Ministry of Housing | Completed 2010 |
3 | Infrastructure Works, Phase 1, Contract ‘1’, Block 1020 & 1026, Lawzi Lake, Hamad Town | 1,512,153.000 | Ministry of Housing | Completed 2008 |
4 | Alba Plant Security Project – Main Fence | 1,915,959.000 | Aluminium Bahrain | 11th May 2010 to 10th May 2012 |
5 | Site 154, Block 1212, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works | 789,537.000 | Ministry of Housing | 01st Dec 2009 to 30th Nov 2010 |
6 | Site 155, Block 1214, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works | 399,949.000 | Ministry of Housing | 01st Dec 2009 to 31st Aug 2010 |
7 | Civil works term Contract | 400,000.000 | Ministry of Works | 2009- 2011 |
8 | Refurbishment of Line 4 and 5 Pot Shell | 795,598.000 | Aluminium Bahrain | January 2009 to January 2011 |
9 | Refurbishment of Anode Rods | 90,343.000 | Aluminium Bahrain | May 2009 to April 2011 |
10 | Cathode Sealing | 429,132.000 | Aluminium Bahrain | September 2008 to August 2010 |
11 | Improvement of Buquwah Village Roads (Block 447, 445, 457) | 1,221,000.000 | Ministry of Works | October 2010 to September 2011 |
12 | Infrastructure works for 77 Nos Townhouses and 12 Nos Apartment buildings, at Site 133, Block 1026 & 1028 Luwzi lake (Phase 3) | 976,348.000 | Ministry of Housing | December 2010 to June 2011 |
13 | Diesel Tank And Filling Facilities At Calciner | 41,641.000 | Aluminium Bahrain | September 2010 to March 2011 |
14 | Refurbishment of Line 4 and 5 Pot Shell | 647,365.000 | Aluminium Bahrain | June 2011 to June 2014 |
15 | Fabrication of Drain Sows | 42,000.000 | Aluminium Bahrain | May 2011 to October 2011 |
16 | Cathode Sealing, Ramming & Shell repair | 215,324.250 | Aluminium Bahrain | June 2011 to December 2011 |
17 | Casthouse Annual Shutdown | 30,400.000 | Aluminium Bahrain | September 2011 to September 2012 |
18 | Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB | 365,775.000 | Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) | Completed |
19 | Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB 08 | 965,000.000 | Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) | Completed |
20 | Earth works for well manifold, Bapco | 685,200.000 | Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) | Completed |
21 | Civil Term Works Contract | 526,315.790 | Ministry of Works | 2011 to 2013 |
22 | Infrastructure Works at Site 153, Hamad Town | 748,520.000 | Ministry of Housing | Completed |
23 | EPC Pipeline Project | 248,387.451 | Tatweer Petroleum / MC: Ramsis Engineering | Completed |
24 | Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 1 | 994,428.500 | Ministry of Works / MC: Bluewater Bio | Completed |
25 | Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 2 | 1,075,053.000 | Ministry of Works / MC: Bluewater Bio | Completed |
26 | Term Contract Earthworks | 2,909,949.750 | Ministry of Housing | On-going |
27 | New Waste Management Sump Facility | 383,438.645 | Bahrain STS | Completed |
28 | HDPE Ring Main | 1,988,262.636 | Bahrain STS | Completed |
29 | Improvement of Shaikh Daij Palace Junction | 771,426.593 | Ministry of Works | Completed |
30 | Infrastructure works for 315nos T3M Houses at Site 128, Sanad | 970,321.720 | Ministry of Housing | On-going |
31 | Infrastructure works for 117nos T8 Houses, Site 159 Block 950, Askar | 628,998.000 | Ministry of Housing | Completed |
32 | Construction of 470m length of Retaining wall at Hunainiya Housing Project | 282,000.000 | Ministry of Housing | Completed |
33 | Site Preparation and General Earthworks at Sanad | 156,872.000 | Ministry of Housing | Completed |
34 | Site Preparation and General Earthworks at Salmabad | 1,556,450.000 | Ministry of Housing | On-going |
35 | Refurbishment of Cast House 1 Cooling Compound | 92,148.000 | ALBA | Completed |
36 | Extension of Bath Storage area at Rodding 1 | 212,500.000 | ALBA | Completed |
37 | Line 1 – 3 Pot Shell repairing | 876,680.000 | ALBA | On-going |
38 | Replacement of Underground Potable Waterline | 141,512.000 | ALBA | Completed |
39 | Installation of Cast Iron cleaning system | 211,200.000 | ALBA | On-going |
40 | Line 4 – 5 Pot Shell repairing | 271,950.000 | ALBA | On-going |
41 | Bus bar and Flexible modification | 1,097,164.000 | ALBA | On-going |
42 | Repair works for GTC 3 & 4 Compartments | 127,000.000 | ALBA | On-going |
43 | Anode Repair works | 298,875.000 | ALBA | On-going |
44 | Infrastructure for Banan Sadad Housing Project | 320,000.000 | Al Namal | On-going |
S.No. | Project Title | Ref No. | Contract Value (BD) | Year of Completion | Client | Nature of Work |
1 | Electrostatic precipitator | 551,880.00 | 1996 | Al Zayani Profabril | Mechanical Works | |
2 | Land reclamation at Alba marine terminal | 284,256.00 | 1997 | Cowi Almoyed Gulf | Mechanical Works | |
3 | Launders + piping cast house – 1 | 75,978.00 | 1997 | Aluminium Bahrain | Mechanical Works | |
4 | Anode cleaning system | 79,002.00 | 1997 | Brochot Scs – France / Aluminium Bahrain | Mechanical Works | |
5 | Installation of Thimble stripper & induction furnace in rodding plant No.1 | 150,066.00 | 1997 | Aluminium Bahrain | Mechanical Works | |
6 | Silo 100 ton + air receiver + piping | 75,222.00 | 1997 | Aleas – Canada / Aluminium Bahrain | Mechanical Works | |
7 | Launders+piping cast house-2 | 41,958.00 | 1998 | Aluminium Bahrain | Mechanical Works | |
8 | Fire fighting system at alba Marine | 198,450.00 | 1998 | Cowi Almoyed Gulf | Mechanical Works | |
9 | Al Hidd Water Desalination Plant | 1,474,200.00 | 1999 | Fisia italimpianti-Italy | Water Desalination plant | |
10 | Erection of Desalination plant | 1,323.000.00 | 1999 | Fisia italimpianti-Italy | Water Desalination plant | |
11 | Fabrication & Erection of Electrostatic precipitator parts | 340,200.00 | 1999 | Fls-Miljo,Denmark | Location: Eastern province cement co. K.S.A | |
12 | Al A’Ali By pass | 1,061,000.00 | 2000 | Ministry of Works | Roads Works | |
13 | Road works at Hawar Island | 150,000.00 | 2000 | Ministry of Housing | Roads Works | |
14 | Roads Works at Qurraya | 169,400.00 | 2000 | Ministry of Works | Infrastructure works | |
15 | Salmabad Bye pass Phase II | 852,825.00 | 2002 | Ministry of Works | Infrastructure works | |
16 | Earthworks,Kerbing,Paving at Site 76&82 | 217,410.00 | 2001 | Ministry of Housing | Infrastructure works | |
17 | Earthworks,Kerbing,Paving at Site 65,Hamad Town | 89,825.00 | 2000 | Ministry of Housing | Infrastructure works | |
18 | Janabiya/Budayia Highway roundabout | 195,800.00 | 2000 | Ministry of Works | Infrastructure works | |
19 | Erection of caliciner plant at alba marine terminal | 206,350.00 | 2000 | DSD-Germany | Mechanical Works | |
20 | Erection of electro static precipitator parts | 56,700.00 | 2000 | Fls-Miljo,Denmark | location: Eastern province Cement Co. | |
21 | Fabrication & Erection of Electro static precipitator parts | 170,100.00 | 2001 | Fls-Miljo,Denmark | Location: Saudi cement Co. K.S.A | |
22 | Refractory Maintenance works | 68,040.00 | 2001 | Aluminium Bahrain | Mechanical Works | |
23 | Security fence & Gate works at Hidd power & Water | 278,472.00 | 2001 | Ministry of Electricity & Water | ||
24 | Comm..assistance of ALBA calciner plant | 270,459.00 | 2002 | Technip-Germany | Mechanical Works | |
25 | Estiqlal Highway | 111,000.00 | 2002 | Ministry of Works | Infrastructure works | |
26 | Security Works gate fence Works at Line 5 Expansion projects | 68,115.00 | 2002 | Aluminium Bahrain | Mechanical Works | |
27 | Comm.Assistance at Alba Calcination Plant | 40,068.00 | 2002 | Motridal-France | ||
28 | Repair of line – 4 pots | 150,444.00 | 2002 | Aluminium Bahrain | Mechanical Works | |
29 | Fabrication & Erection of group-4 Furnaces in CH-1 | 70,119.00 | 2002 | Aluminium Bahrain | Mechanical Works | |
30 | Fabrication & Installation of bath treatment plant ducting | 30,051.00 | 2002 | Aluminium Bahrain | Mechanical Works | |
31 | Fabrication & Installation of Ducting in Roding 1 & 2 | 22,037.00 | 2002 | Aluminium Bahrain | Mechanical Works | |
32 | Earthworks,Kerbing,Paving at Madinat Hamad site 89,Rowdha District | 151,200.00 | 2002 | Ministry of Housing | Infrastructure works | |
33 | Re-tubing of distiller in Desalination plant | 58,098.00 | 2002 | Ministry of Electricity & Water | ||
34 | Blasting & Painting of Distiller in Desalination Plant | 41,069.00 | 2002 | Ministry of Electricity & Water | ||
35 | Fabrication & Installation of Guard Towers | 61,614.00 | 2003 | U.S.Air base in Bahrain | Infrastructure works | |
36 | Resurfacing at Airport Avenue | 383,500.00 | 2003 | Ministry of Works | Infrastructure works | |
37 | Installation of Articulated spouts | 12,020.00 | 2003 | Aluminium Bahrain | Installation Works | |
38 | Stand by feeder water tanks & plumbing system | 33,226.00 | 2003 | Aluminium Bahrain | Mechanical Works | |
39 | New fire water line for green coke storage area | 14,024.00 | 2003 | Aluminium Bahrain | Mechanical Works | |
40 | Patch repairs of Line 1-3 potshells | 67,284.00 | 2003 | Aluminium Bahrain | Mechanical Works | |
41 | General Services –Term contract | 200,340.00 | 2003 | Bechtel | Mechanical Works | |
42 | Site preparation for new work shop | 85,428.00 | 2003 | Aluminium Bahrain | Mechanical Works | |
43 | Green coke storage silo & conveyors | 336,420.00 | 2003 | Aluminium Bahrain | Mechanical Works | |
44 | Fencing works for line 5 Expansion | 90,153.00 | 2003 | Aluminium Bahrain | Mechanical Works | |
45 | Overhauling of superstructures | 450,765.00 | 2003 | Aluminium Bahrain | Mechanical Works | |
46 | Repairs of Anode Trailers | 200,340.00 | 2003 | Aluminium Bahrain | Mechanical Works | |
47 | Mod.& repair of Coolers in Calciner Plant | 70,119.00 | 2003 | Technip-Germany | Mechanical Works | |
48 | Repair of Line 4 Pot shells | 341,712.00 | 2004 | Aluminium Bahrain | Mechanical Works | |
49 | Up grading of DC-6 | 41,202.00 | 2004 | Aluminium Bahrain | Mechanical Works | |
50 | Mechanical Installation of Alumina Handling Systems | 248387-021-HC3-M028-50005 | 1,814,400.00 | 2005 | Bechtel/ALBA | Installation Works |
51 | General Services for Line 5 Expansion project | 24837-000-HC5-G902-5001 | 861,462.00 | 2005 | Bechtel/ALBA | Mechanical Works |
52 | Sheeting, Cladding & Ventilation Works | 1,020,600.00 | 2005 | Aluminium Bahrain | Mechanical Works | |
53 | Supply & Installation of bath treatment plant | 901,530.00 | 2005 | Bechtel/ALBA | Mechanical Works | |
54 | Refractory Lining of Line 4 pot shells | 180,306.00 | 2005 | Aluminium Bahrain | Mechanical Works | |
55 | Paving & Kerbing – Roads works at Riffa | 470,232.00 | 2005 | Ministry of Works | Infrastructure works | |
56 | Filling - Bussaiyteen | 429,000.00 | 2005 | Ministry of Housing | Filling | |
57 | improvement of Darkulayb Village Roads, Phase-1 | 44-065/2003 | 240,000.00 | 2006 | Ministry of Works & Housing | Construction of 1KM Road, with footpath & underground Services i.e. Drainage, Water Main line & connection to Houses complete. |
58 | External Works- Royal University for Women at West Riffa (Phase 1) (As a Subcontractor of GPZ (overseas) Ltd) | 0512/21-17254 | 307,525.00 | 2006 | Royal University for Women / HAJ / Gulf House Engineering | Site Preparation, Service trenches, Kerbs & Pavings |
59 | Supply & Installation of Rock Rubble Bund at Island 14A, at NBNT Budaiya (As a Subcontractor of Boskalis Westminister- Van Oord JV) | NBNT-414-PHU | 292,950.00 | 2006 | Ministry of Works & Housing | Rock Rubble Bund |
60 | Site Preparation & Dismantling Works, RGDP, BAPCO (As a Subcontractor of Foster Wheeler Italiana S.P.A) | AP-004/1-0275A | 384,560.00 | 2006 | Bahrain Petroleum Company B.S.C (closed) | Dismantling of existing str., Site Preparation, Sewer Line Installation, Asphalting,, modification of steel Str. Pipe support & Piping modifications |
61 | Pot repairing, Line 4 | S/45054426 | 341,150.00 | 2006 | Aluminium Bahrain | Pot sell repairing & Maintenance |
62 | Repair / Refurbish of Line 4 & 5, ALBA | S/45090211 | 234,600.00 | 2007 | Aluminium Bahrain | Transportation |
63 | Line 3 pot shell repair | 68,581.00 | 2007 | Aluminium Bahrain | Mechanical Works | |
64 | Upgrading anode handling system | 122,282.00 | 2007 | Brochot | Mechanical Works | |
65 | Line 1 – 2 pot shell repair | 95,652.00 | 2007 | Aluminium Bahrain | Mechanical Works | |
66 | Alba pot ramming | 751,198.00 | 2007 | Aluminium Bahrain | Mechanical Works | |
67 | Annual Maintenance Cast Hose | 58,203.00 | 2007 | Aluminium Bahrain | Mechanical Works | |
68 | Plant-Wide refractory Maintenance | 457,660.00 | 2007 | Aluminium Bahrain | Mechanical Works | |
69 | Fabrication & Supply of Sole Plate (as a Subcontractor of Gantry Middle East) | 77621/31717 & 78387/31720 | 242,000.00 | 2007 | ASRY | Steel Fabrication Job |
70 | Site preparation & Dismantling RDG | 119,014.00 | 2007 | Foster Wheeler / Bapco | Site preparation | |
71 | New Electro Static Precipitator at GIIC, Bahrain (As a Subcontractor of FLSmidth Airtech, Denmark) | 5503637-69421 | 406,026.00 | 2008 | GIIC Bahrain | Pile Foundations, Electric Sub Station Building, Bunker, Fabrication & Erection of ESP, Steel Support Roof, Steel Support, Access facility, Duct & support, Expansion Joints |
72 | Hiring of Fork Lifts, ALBA | S/45088572 | 432,000.00 | 2008 | Aluminium Bahrain | Hiring job |
73 | Replacement of Sitra Bridge, Fabrication of Main Truss (as Subcontractor of Gamuda Berhad) | GB/SB/300/L-0964/07 | 497,060.00 | 2008 | Ministry of Works & Housing / Cowi Almoayed Gulf | Fabrication of Steel Truss for Bridge |
74 | Preliminary Grading works, Contract “E”, Lawzi Lake, Madinat Hamad | 91-91-19-07 | 930,956.00 | 2008 | Ministry of Housing | Major excavation & Filling Works |
75 | Rockwork for Beaches- Stage 2, at NBNT Budaiya (As a Subcontractor of Boskalis Westminister- Van Oord JV) | NBNT-05470-PSTU-ATCM-5.3 | 445,733.00 | 2008 | Ministry of Works & Housing | Slope protection works by 200-500 kg armour rock |
76 | EPCC Klin no. 1 & 2 Upgrading of dedusting system ( As a Subcontractor of FLSmidth Airtech, Denmark) | 5503722-70707 | 271,500.00 | 2009 (to be completed in December) | Eastern Province Cement Company, KSA / FLSmidth Airtech, Denmark | Mechanical Erections and insulation |
77 | Replacement of Sitra Bridge, Demolition, Roads, Paving & Drainage Works. (As a Subcontractor of Gamuda Berhad) | GB/SB/300/L-1376/08 | 620,000.00 | 2008 | Ministry of Works & Housing / Cowi Almoayed Gulf | Minor Dismantling, Preparation for Traffic diversion , Storm water Drainage Line |
78 | EPCC Klin no. 1 & 2 Upgrading of dedusting system ( As A Subcontractor of FLSmidth Airtech, Denmark) | 5503722-70706 | 928,340.00 | 2009 (to be completed in May 2010) | Eastern Province Cement Company, KSA / FLSmidth Airtech, Denmark | Mechanical Erections and insulation |
79 | Hiring of Fork Lifts, ALBA | S/45114729 | 405,600.00 | 2010 (to be completed in April 2010) | Aluminium Bahrain | Hiring job |
bottm list showcase
bechtel03.jpg
civil-work01 1.jpg
new_waste_management_06 1.jpg
https://www.atlastcm.com/images/new_waste_management_06 1.jpg
askar04 1.jpg
bechtel02.jpg
new-waste-management-06.jpg
new-waste-management-01.jpg
ring-man02.jpg
ring-man05.jpg
workshop09 1.jpg