S.No. Project Title Contract Value (BD) Client Commencement & Completion Date
1 Infrastructure Works, 230no. Town Houses, Block 643/646, Nuwaidrat 1,036,460.000 Ministry of Housing Completed 2008
2 Earthwork, Kerbing, Paving and storm Water Channel Work, Lawzi Lake Hamad Town Contract -3 749,000.000 Ministry of Housing Completed 2010
3 Infrastructure Works, Phase 1, Contract ‘1’, Block 1020 & 1026, Lawzi Lake, Hamad Town 1,512,153.000 Ministry of Housing Completed 2008
4 Alba Plant Security Project – Main Fence 1,915,959.000 Aluminium Bahrain 11th May 2010  to 10th May 2012
5 Site 154, Block 1212, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works 789,537.000 Ministry of Housing 01st Dec 2009 to 30th Nov 2010
6 Site 155, Block 1214, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works 399,949.000 Ministry of Housing 01st Dec 2009 to 31st Aug 2010
7 Civil works term Contract 400,000.000 Ministry of Works 2009- 2011
8 Refurbishment of Line 4 and 5 Pot Shell 795,598.000 Aluminium Bahrain January 2009 to January 2011
9 Refurbishment of Anode Rods 90,343.000 Aluminium Bahrain May 2009 to April 2011
10 Cathode Sealing 429,132.000 Aluminium Bahrain September 2008 to August 2010
11 Improvement of Buquwah Village Roads (Block 447, 445, 457) 1,221,000.000 Ministry of Works October 2010 to September 2011
12 Infrastructure works for 77 Nos Townhouses and 12 Nos Apartment buildings, at Site 133, Block 1026 & 1028 Luwzi lake (Phase 3) 976,348.000 Ministry of Housing December 2010 to June 2011
13 Diesel Tank And Filling Facilities At Calciner 41,641.000 Aluminium Bahrain September 2010 to March 2011
14 Refurbishment of Line 4 and 5 Pot Shell 647,365.000 Aluminium Bahrain June 2011 to June 2014
15 Fabrication of Drain Sows 42,000.000 Aluminium Bahrain May 2011 to October 2011
16 Cathode Sealing, Ramming & Shell repair 215,324.250 Aluminium Bahrain June 2011 to December 2011
17 Casthouse Annual Shutdown 30,400.000 Aluminium Bahrain September 2011 to September 2012
18 Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB  365,775.000 Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) Completed
19 Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB 08 965,000.000 Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) Completed
20 Earth works for well manifold, Bapco 685,200.000 Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) Completed
21 Civil Term Works Contract 526,315.790 Ministry of Works 2011 to 2013
22 Infrastructure Works at Site 153, Hamad Town 748,520.000 Ministry of Housing Completed
23 EPC Pipeline Project 248,387.451 Tatweer Petroleum / MC: Ramsis Engineering Completed
24 Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 1 994,428.500 Ministry of Works / MC: Bluewater Bio Completed
25 Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 2 1,075,053.000 Ministry of Works / MC: Bluewater Bio Completed
26 Term Contract Earthworks 2,909,949.750 Ministry of Housing On-going
27 New Waste Management Sump Facility 383,438.645 Bahrain STS Completed
28 HDPE Ring Main 1,988,262.636 Bahrain STS Completed
29 Improvement of Shaikh Daij Palace Junction 771,426.593 Ministry of Works Completed
30 Infrastructure works for 315nos T3M Houses at Site 128, Sanad 970,321.720 Ministry of Housing On-going
31 Infrastructure works for 117nos T8 Houses, Site 159 Block 950, Askar 628,998.000 Ministry of Housing Completed
32 Construction of 470m length of Retaining wall at Hunainiya Housing Project 282,000.000 Ministry of Housing Completed
33 Site Preparation and General Earthworks at Sanad 156,872.000 Ministry of Housing Completed
34 Site Preparation and General Earthworks at Salmabad 1,556,450.000 Ministry of Housing On-going
35 Refurbishment of Cast House 1 Cooling Compound 92,148.000 ALBA Completed
36 Extension of Bath Storage area at Rodding 1 212,500.000 ALBA Completed
37 Line 1 – 3 Pot Shell repairing 876,680.000 ALBA On-going
38 Replacement of Underground Potable Waterline 141,512.000 ALBA Completed
39 Installation of Cast Iron cleaning system 211,200.000 ALBA On-going
40 Line 4 – 5 Pot Shell repairing 271,950.000 ALBA On-going
41 Bus bar and Flexible modification 1,097,164.000 ALBA On-going
42 Repair works for GTC 3 & 4 Compartments 127,000.000 ALBA On-going
43 Anode Repair works 298,875.000 ALBA On-going
44 Infrastructure for Banan Sadad Housing Project 320,000.000 Al Namal On-going
S.No. Ref No. Project Title Contract Value Client Year Engaged
1 FWI Contract 1-BD-0275A Refinery Gas Desulphurisation Project   BAPCO/ Foster Wheeler 2007
2 Contract No. C0182 Upgrade Oily Water Separator-Sitra Tank Farm   BAPCO 2000
3 Tender No.- T117 Provide and Install Fence and Property Markers at Valve Stations   BANOCO 2000
4 Contract No. 1883 New Fencing Around Khuff Well# 580 & Drlg Sump Demolition: Moan Items   BANOCO 2000
5   Well 360 & 367: Removal/Reinstallation of Fencing   BANOCO 2000
6 Contract No. 1836 New Fencing Around Khuff Well# 579 & Drlg Sump Demolition: Moan Items   BANOCO 2000
7 Contract No. 1878 New Fencing Around Khuff Well# 578 & Drlg Sump Demolition: Moan Items   BANOCO 2000
8 Contract No. 1885 Civil Works for New Gas Dehydration Unit K-28   BANOCO 1999
9 Contract No.1557 Construction of New Warehouse at Jebel   BANOCO 1999
10 Contract No. 1811 Mechanical Works at HMS & HPWC   BANOCO 1999
11 Contract No. 1649 Site Preparation & Cellar Construction for Wells 587,591,593,595 & 607   BANOCO 1998
12 Contract No. 1729 Construction Services of the Onshore 16" dia Pipeline between GPIC & Al Dar Valve Stations   BANOCO 1998
S.No. Project Title Contract Value (BD) Client Commencement & Completion Date
1 Infrastructure Works, 230no. Town Houses, Block 643/646, Nuwaidrat 1,036,460.000 Ministry of Housing Completed 2008
2 Earthwork, Kerbing, Paving and storm Water Channel Work, Lawzi Lake Hamad Town Contract -3 749,000.000 Ministry of Housing Completed 2010
3 Infrastructure Works, Phase 1, Contract ‘1’, Block 1020 & 1026, Lawzi Lake, Hamad Town 1,512,153.000 Ministry of Housing Completed 2008
4 Alba Plant Security Project – Main Fence 1,915,959.000 Aluminium Bahrain 11th May 2010  to 10th May 2012
5 Site 154, Block 1212, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works 789,537.000 Ministry of Housing 01st Dec 2009 to 30th Nov 2010
6 Site 155, Block 1214, Madinat Hamad – Design and build of house plots level, site preparation, earth works, grading and infrastructure works 399,949.000 Ministry of Housing 01st Dec 2009 to 31st Aug 2010
7 Civil works term Contract 400,000.000 Ministry of Works 2009- 2011
8 Refurbishment of Line 4 and 5 Pot Shell 795,598.000 Aluminium Bahrain January 2009 to January 2011
9 Refurbishment of Anode Rods 90,343.000 Aluminium Bahrain May 2009 to April 2011
10 Cathode Sealing 429,132.000 Aluminium Bahrain September 2008 to August 2010
11 Improvement of Buquwah Village Roads (Block 447, 445, 457) 1,221,000.000 Ministry of Works October 2010 to September 2011
12 Infrastructure works for 77 Nos Townhouses and 12 Nos Apartment buildings, at Site 133, Block 1026 & 1028 Luwzi lake (Phase 3) 976,348.000 Ministry of Housing December 2010 to June 2011
13 Diesel Tank And Filling Facilities At Calciner 41,641.000 Aluminium Bahrain September 2010 to March 2011
14 Refurbishment of Line 4 and 5 Pot Shell 647,365.000 Aluminium Bahrain June 2011 to June 2014
15 Fabrication of Drain Sows 42,000.000 Aluminium Bahrain May 2011 to October 2011
16 Cathode Sealing, Ramming & Shell repair 215,324.250 Aluminium Bahrain June 2011 to December 2011
17 Casthouse Annual Shutdown 30,400.000 Aluminium Bahrain September 2011 to September 2012
18 Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB  365,775.000 Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) Completed
19 Excavation, Filling & Grading Works for Tank Battery, Bapco Site, TB 08 965,000.000 Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) Completed
20 Earth works for well manifold, Bapco 685,200.000 Tatweer Petroleum / MC: Bahrain Special Technical Services (STS) Completed
21 Civil Term Works Contract 526,315.790 Ministry of Works 2011 to 2013
22 Infrastructure Works at Site 153, Hamad Town 748,520.000 Ministry of Housing Completed
23 EPC Pipeline Project 248,387.451 Tatweer Petroleum / MC: Ramsis Engineering Completed
24 Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 1 994,428.500 Ministry of Works / MC: Bluewater Bio Completed
25 Tubli WPCC- Upgrading of secondary Treatment using HYBACS System – Phase 2 1,075,053.000 Ministry of Works / MC: Bluewater Bio Completed
26 Term Contract Earthworks 2,909,949.750 Ministry of Housing On-going
27 New Waste Management Sump Facility 383,438.645 Bahrain STS Completed
28 HDPE Ring Main 1,988,262.636 Bahrain STS Completed
29 Improvement of Shaikh Daij Palace Junction 771,426.593 Ministry of Works Completed
30 Infrastructure works for 315nos T3M Houses at Site 128, Sanad 970,321.720 Ministry of Housing On-going
31 Infrastructure works for 117nos T8 Houses, Site 159 Block 950, Askar 628,998.000 Ministry of Housing Completed
32 Construction of 470m length of Retaining wall at Hunainiya Housing Project 282,000.000 Ministry of Housing Completed
33 Site Preparation and General Earthworks at Sanad 156,872.000 Ministry of Housing Completed
34 Site Preparation and General Earthworks at Salmabad 1,556,450.000 Ministry of Housing On-going
35 Refurbishment of Cast House 1 Cooling Compound 92,148.000 ALBA Completed
36 Extension of Bath Storage area at Rodding 1 212,500.000 ALBA Completed
37 Line 1 – 3 Pot Shell repairing 876,680.000 ALBA On-going
38 Replacement of Underground Potable Waterline 141,512.000 ALBA Completed
39 Installation of Cast Iron cleaning system 211,200.000 ALBA On-going
40 Line 4 – 5 Pot Shell repairing 271,950.000 ALBA On-going
41 Bus bar and Flexible modification 1,097,164.000 ALBA On-going
42 Repair works for GTC 3 & 4 Compartments 127,000.000 ALBA On-going
43 Anode Repair works 298,875.000 ALBA On-going
44 Infrastructure for Banan Sadad Housing Project 320,000.000 Al Namal On-going
S.No. Project Title Ref No. Contract Value (BD) Year of Completion Client Nature of Work
1 Electrostatic precipitator   551,880.00 1996 Al Zayani Profabril Mechanical Works
2 Land reclamation at Alba marine terminal   284,256.00 1997 Cowi Almoyed Gulf Mechanical Works
3 Launders + piping cast house – 1   75,978.00 1997 Aluminium Bahrain Mechanical Works
4 Anode cleaning system   79,002.00 1997 Brochot Scs – France / Aluminium Bahrain Mechanical Works
5 Installation of Thimble stripper & induction furnace in rodding plant No.1   150,066.00 1997 Aluminium Bahrain Mechanical Works
6 Silo 100 ton + air receiver + piping   75,222.00 1997 Aleas – Canada / Aluminium Bahrain Mechanical Works
7 Launders+piping cast house-2   41,958.00 1998 Aluminium Bahrain Mechanical Works
8 Fire fighting system at alba Marine   198,450.00 1998 Cowi Almoyed Gulf Mechanical Works
9 Al Hidd Water Desalination Plant   1,474,200.00 1999 Fisia italimpianti-Italy Water Desalination plant
10 Erection of Desalination plant   1,323.000.00 1999 Fisia italimpianti-Italy Water Desalination plant
11 Fabrication & Erection of Electrostatic precipitator parts   340,200.00 1999 Fls-Miljo,Denmark Location: Eastern province cement co. K.S.A
12 Al A’Ali By pass   1,061,000.00 2000 Ministry of Works Roads Works
13 Road works at Hawar Island   150,000.00 2000 Ministry of Housing Roads Works
14 Roads Works at Qurraya   169,400.00 2000 Ministry of Works Infrastructure works
15 Salmabad Bye pass Phase II   852,825.00 2002 Ministry of Works Infrastructure works
16 Earthworks,Kerbing,Paving at Site 76&82   217,410.00 2001 Ministry of Housing Infrastructure works
17 Earthworks,Kerbing,Paving at Site 65,Hamad Town   89,825.00 2000 Ministry of Housing Infrastructure works
18 Janabiya/Budayia Highway roundabout   195,800.00 2000 Ministry of Works Infrastructure works
19 Erection of caliciner plant at alba marine terminal   206,350.00 2000 DSD-Germany Mechanical Works
20 Erection of electro static precipitator parts   56,700.00 2000 Fls-Miljo,Denmark location: Eastern province Cement Co.
21 Fabrication & Erection of Electro static precipitator parts   170,100.00 2001 Fls-Miljo,Denmark Location: Saudi cement Co. K.S.A
22 Refractory Maintenance works   68,040.00 2001 Aluminium Bahrain Mechanical Works
23 Security fence & Gate works at Hidd power & Water   278,472.00 2001 Ministry of Electricity & Water  
24 Comm..assistance of ALBA calciner plant   270,459.00 2002 Technip-Germany Mechanical Works
25 Estiqlal Highway   111,000.00 2002 Ministry of Works Infrastructure works
26 Security Works gate fence Works at Line 5 Expansion projects   68,115.00 2002 Aluminium Bahrain Mechanical Works
27 Comm.Assistance at Alba Calcination Plant   40,068.00 2002 Motridal-France  
28 Repair of line – 4 pots   150,444.00 2002 Aluminium Bahrain Mechanical Works
29 Fabrication & Erection of group-4 Furnaces in CH-1   70,119.00 2002 Aluminium Bahrain Mechanical Works
30 Fabrication & Installation of bath treatment plant ducting   30,051.00 2002 Aluminium Bahrain Mechanical Works
31 Fabrication & Installation of Ducting in Roding 1 & 2   22,037.00 2002 Aluminium Bahrain Mechanical Works
32 Earthworks,Kerbing,Paving at Madinat Hamad site 89,Rowdha District   151,200.00 2002 Ministry of Housing Infrastructure works
33 Re-tubing of distiller in Desalination plant   58,098.00 2002 Ministry of Electricity & Water  
34 Blasting & Painting of Distiller in Desalination Plant   41,069.00 2002 Ministry of Electricity & Water  
35 Fabrication & Installation of Guard Towers   61,614.00 2003 U.S.Air base in Bahrain Infrastructure works
36 Resurfacing at Airport Avenue   383,500.00 2003 Ministry of Works Infrastructure works
37 Installation of Articulated spouts   12,020.00 2003 Aluminium Bahrain Installation Works
38 Stand by feeder water tanks & plumbing system   33,226.00 2003 Aluminium Bahrain Mechanical Works
39 New fire water line for green coke storage area   14,024.00 2003 Aluminium Bahrain Mechanical Works
40 Patch repairs of Line 1-3 potshells   67,284.00 2003 Aluminium Bahrain Mechanical Works
41 General Services –Term contract   200,340.00 2003 Bechtel Mechanical Works
42 Site preparation for new work shop   85,428.00 2003 Aluminium Bahrain Mechanical Works
43 Green coke storage silo & conveyors   336,420.00 2003 Aluminium Bahrain Mechanical Works
44 Fencing works for line 5 Expansion   90,153.00 2003 Aluminium Bahrain Mechanical Works
45 Overhauling of superstructures   450,765.00 2003 Aluminium Bahrain Mechanical Works
46 Repairs of Anode Trailers   200,340.00 2003 Aluminium Bahrain Mechanical Works
47 Mod.& repair of Coolers in Calciner Plant   70,119.00 2003 Technip-Germany Mechanical Works
48 Repair of Line 4 Pot shells   341,712.00 2004 Aluminium Bahrain Mechanical Works
49 Up grading of DC-6   41,202.00 2004 Aluminium Bahrain Mechanical Works
50 Mechanical Installation of Alumina Handling Systems 248387-021-HC3-M028-50005 1,814,400.00 2005 Bechtel/ALBA Installation Works
51 General Services for Line 5 Expansion project 24837-000-HC5-G902-5001 861,462.00 2005 Bechtel/ALBA Mechanical Works
52 Sheeting, Cladding & Ventilation Works   1,020,600.00 2005 Aluminium Bahrain Mechanical Works
53 Supply & Installation of bath treatment plant   901,530.00 2005 Bechtel/ALBA Mechanical Works
54 Refractory Lining of Line 4 pot shells   180,306.00 2005 Aluminium Bahrain Mechanical Works
55 Paving & Kerbing – Roads works at Riffa   470,232.00 2005 Ministry of Works Infrastructure works
56 Filling  - Bussaiyteen   429,000.00 2005 Ministry of Housing Filling
57 improvement of Darkulayb Village Roads, Phase-1 44-065/2003 240,000.00 2006 Ministry of Works & Housing Construction of 1KM Road, with footpath & underground Services i.e. Drainage, Water Main line & connection to Houses complete.
58 External  Works- Royal University for Women at West Riffa (Phase 1) (As a Subcontractor of GPZ (overseas) Ltd) 0512/21-17254 307,525.00 2006 Royal University for Women / HAJ / Gulf House Engineering Site Preparation, Service trenches, Kerbs & Pavings
59 Supply & Installation of Rock Rubble Bund at Island 14A, at NBNT Budaiya (As a Subcontractor of Boskalis Westminister- Van Oord JV) NBNT-414-PHU 292,950.00 2006 Ministry of Works & Housing Rock Rubble Bund
60 Site Preparation & Dismantling  Works, RGDP, BAPCO (As a Subcontractor of Foster Wheeler Italiana S.P.A) AP-004/1-0275A 384,560.00 2006 Bahrain Petroleum Company B.S.C (closed) Dismantling of existing str., Site Preparation, Sewer Line Installation, Asphalting,, modification of steel Str. Pipe support & Piping modifications
61 Pot repairing, Line 4 S/45054426 341,150.00 2006 Aluminium Bahrain Pot sell repairing & Maintenance
62 Repair / Refurbish of Line 4 & 5, ALBA S/45090211 234,600.00 2007 Aluminium Bahrain Transportation
63 Line 3 pot shell repair   68,581.00 2007 Aluminium Bahrain Mechanical Works
64 Upgrading anode handling system   122,282.00 2007 Brochot Mechanical Works
65 Line  1 – 2 pot shell repair   95,652.00 2007 Aluminium Bahrain Mechanical Works
66 Alba pot ramming   751,198.00 2007 Aluminium Bahrain Mechanical Works
67 Annual Maintenance Cast Hose   58,203.00 2007 Aluminium Bahrain Mechanical Works
68 Plant-Wide refractory Maintenance   457,660.00 2007 Aluminium Bahrain Mechanical Works
69 Fabrication & Supply of Sole Plate (as a Subcontractor of Gantry Middle East) 77621/31717 & 78387/31720 242,000.00 2007 ASRY Steel Fabrication Job
70 Site preparation & Dismantling RDG   119,014.00 2007 Foster Wheeler / Bapco Site preparation
71 New Electro Static Precipitator  at GIIC, Bahrain (As a Subcontractor of FLSmidth Airtech, Denmark) 5503637-69421 406,026.00 2008 GIIC Bahrain Pile Foundations, Electric Sub Station Building, Bunker, Fabrication & Erection of ESP, Steel Support Roof, Steel Support, Access facility, Duct & support, Expansion Joints
72 Hiring of Fork Lifts, ALBA S/45088572 432,000.00 2008 Aluminium Bahrain Hiring job
73 Replacement of Sitra Bridge, Fabrication of Main Truss (as Subcontractor of Gamuda Berhad) GB/SB/300/L-0964/07 497,060.00 2008 Ministry of Works & Housing / Cowi Almoayed Gulf Fabrication of Steel Truss for Bridge
74 Preliminary  Grading works, Contract “E”, Lawzi Lake, Madinat Hamad 91-91-19-07 930,956.00 2008 Ministry of Housing Major excavation & Filling Works
75 Rockwork for Beaches- Stage 2, at NBNT Budaiya (As a Subcontractor of Boskalis Westminister- Van Oord JV) NBNT-05470-PSTU-ATCM-5.3 445,733.00 2008 Ministry of Works &  Housing Slope protection works by 200-500 kg armour rock
76 EPCC Klin no. 1 & 2 Upgrading of dedusting system ( As a Subcontractor of FLSmidth Airtech, Denmark) 5503722-70707 271,500.00 2009 (to be completed in December) Eastern Province Cement Company, KSA / FLSmidth Airtech, Denmark Mechanical Erections and insulation
77 Replacement of Sitra Bridge, Demolition, Roads, Paving & Drainage Works. (As a Subcontractor of Gamuda Berhad) GB/SB/300/L-1376/08 620,000.00 2008 Ministry of Works & Housing / Cowi Almoayed Gulf Minor Dismantling, Preparation for Traffic diversion , Storm water Drainage Line
78 EPCC Klin no. 1 & 2 Upgrading of dedusting system ( As A Subcontractor of FLSmidth Airtech, Denmark) 5503722-70706 928,340.00 2009 (to be completed in  May 2010) Eastern Province Cement Company, KSA / FLSmidth Airtech, Denmark Mechanical Erections and insulation
79 Hiring of Fork Lifts, ALBA S/45114729 405,600.00 2010 (to be completed in April 2010) Aluminium Bahrain Hiring job